ProCurve 6400cl Guía de usuario Pagina 271

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 718
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 270
Switch Meshing
Configuring Switch Meshing
Configuring Switch Meshing
Preparation
Before configuring switch meshing:
■ Review the Operating Rules (page 7-5), and particularly the restrictions
and requirements for using switch meshing in environments that include
static trunks, multiple static VLANs, GVRP, IGMP, and STP.
■ To avoid unnecessary system disruption, plan the mesh bring-up to min-
imize temporary port-blocking. (Refer to “Bringing Up a Switch Mesh
Domain:” on page 7-10.)
■ To view the current switch mesh status on the switch, use the CLI show
mesh command (page 7-14).
Menu: To Configure Switch Meshing
1. From the Main Menu, select:
2. Switch Configuration
2. Port/Trunk Settings
2. Press [E] (for Edit) to access the load balancing parameters.
Figure 7-8. Example of the Screen for Configuring Ports for Meshing
7-11
Vista de pagina 270
1 2 ... 266 267 268 269 270 271 272 273 274 275 276 ... 717 718

Comentarios a estos manuales

Sin comentarios